change order of taskbar thumbnail previews?

garbanzo

New member
Local time
11:54 PM
Messages
575
Location
budapest
i always keep 2 firefox windows open when i'm working, one for work and one for, uh, non-work stuff. i always open my non-work window first, so its preview thumbnail is on the left, while the other window's preview thumb is on the right.

lately, they've been swapping for some reason. i'll go to open a particular window using the taskbar, and it will be on the wrong side.

is there any way to switch these short of shutting down the first window and opening it again?

i know it's pedantic, but i'm compulsive about this sort of thing, and it's really bugging me :mad2:
 

My Computer My Computer

At a glance

7600 x86Core 2 Duo e7200, 2.53 ghz2x DDR2 PC5300 1gb, 667 mhzGeForce 9500gt, 512mb
OS
7600 x86
CPU
Core 2 Duo e7200, 2.53 ghz
Motherboard
Micro-Star MS-7529
Memory
2x DDR2 PC5300 1gb, 667 mhz
Graphics Card(s)
GeForce 9500gt, 512mb
Monitor(s) Displays
22" LG Flatron w2234s
Screen Resolution
1680x1050
Hard Drives
Excelstor SATA-II 250gb 7200rpm, 8mb cache
PSU
CoolerMaster M520
Internet Speed
30/20 mbits
Open them in order?

=D
 

My Computer My Computer

At a glance

7264x64/7260x86
OS
7264x64/7260x86
yeah, thanks for that. most helpful.
 

My Computer My Computer

At a glance

7600 x86Core 2 Duo e7200, 2.53 ghz2x DDR2 PC5300 1gb, 667 mhzGeForce 9500gt, 512mb
OS
7600 x86
CPU
Core 2 Duo e7200, 2.53 ghz
Motherboard
Micro-Star MS-7529
Memory
2x DDR2 PC5300 1gb, 667 mhz
Graphics Card(s)
GeForce 9500gt, 512mb
Monitor(s) Displays
22" LG Flatron w2234s
Screen Resolution
1680x1050
Hard Drives
Excelstor SATA-II 250gb 7200rpm, 8mb cache
PSU
CoolerMaster M520
Internet Speed
30/20 mbits
I wish someone would have answered this seriously. I hate this too. I'm with ya garbanzo!
 

My Computer My Computer

At a glance

Windows 7 64
Computer type
Laptop
Computer Manufacturer/Model Number
DELL
OS
Windows 7 64
Back
Top