Windows 7 Forums Search
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find solutions with any problems, errors or issues you are experiencing with Windows 7. The Windows 7 forum also covers news and updates and has an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7 - How to change the order of startup programs

 
06-26-2011   #11


 


I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Windows 7 performance will show its appreciation.

My System SpecsSystem Spec
06-26-2011   #12


Windows 7 Home Premium SP1, clean install, upgrade disc
 
 


Quote   Quote: Originally Posted by gregrocker View Post
For absolute best performance uncheck all Startup items except AV and gadgets in msconfig>Startup. Only let in those you can't do without starting up with Windows 7. Startup Programs - Change

For even better performance replace the MucAfee bloatware with lean lightweight MSE or Avast 6.
Agreed. When I went from Mcafee to MSE, MSE even found a Trojan missed by Mcafee.
If you do switch, be sure to use the uninstall tool provided by Mcafee.
My System SpecsSystem Spec
06-26-2011   #13


MS Windows 7 Ultimate SP1 64-bit
 
 


Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Windows 7 performance will show its appreciation.
+1
Sometimes you will find that you also need to also let the synaptics touchpad driver install.

Greg has given you some excellent advice. If you would like you can use the following procedure and we can look at precisely what msconfig shows as starting.

LIST OF STARTUP PROGRAMS USING CCLEANER


CCleaner | Tasks icon | Startup tab | click on Save to text file button (bottom right side)

Using the PAPER CLIP icon in the top panel of a Message Reply window, attach the .txt file generated by CCleaner.

Last edited by karlsnooks; 06-26-2011 at 08:14 PM.. Reason: bad english
My System SpecsSystem Spec
.


06-26-2011   #14


Windows 7 Professional 64bit SP1
 
 


Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Windows 7 performance will show its appreciation.
Each to their own of course Greg. I've used WP for years and suffered only one minor glitch with a particular update. Otherwise it's always saved me far more boot time than it costs. When I installed Soluto (for a looksee) it calculated that WP added under two seconds. It suits me because it delivers the volume of starts I require in 44 seconds, whereas Windows/msconfig is over a minute.
My System SpecsSystem Spec
06-26-2011   #15


Windows 7 Ultimate RTM (Technet)
 
 


Remove McAfee and install MSE....problem solved.
My System SpecsSystem Spec
06-27-2011   #16
whs


Vista and Windows7, sometimes Ubuntu and Fedora
 
 


Quote   Quote: Originally Posted by Oaken View Post
Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Windows 7 performance will show its appreciation.
Each to their own of course Greg. I've used WP for years and suffered only one minor glitch with a particular update. Otherwise it's always saved me far more boot time than it costs. When I installed Soluto (for a looksee) it calculated that WP added under two seconds. It suits me because it delivers the volume of starts I require in 44 seconds, whereas Windows/msconfig is over a minute.
I have to agree. I use it all the time (the pro version) and never had a problem. I like it especially for easy of delaying startups. Besides it is a good watchdog.
My System SpecsSystem Spec
06-27-2011   #17


MS Windows 7 Ultimate SP1 64-bit
 
 


For the every day user, MSCONFIG is plenty. For the advanced user, there is autoruns, procexp, and procmon.
My System SpecsSystem Spec
06-27-2011   #18


 


If you have no startups besides AV and gadgets, which gives best performance, why would you need WinPatrol or Soluto? To delay System services?

Just askin.
My System SpecsSystem Spec
Reply

 How to change the order of startup programs problems?



Thread Tools



Similar Threads for: How to change the order of startup programs
Thread Forum
Startup Programs - Change Tutorials
Solved Order of programs in boot Performance & Maintenance
Control the order of start-up programs Performance & Maintenance
How do we get Win7 to open programs in a certain order like XP ? Customization
Why is there no Control Panel/Programs/Change Startup.. Software


All times are GMT -5. The time now is 04:23 AM.



Windows 7 Forums is an independent web site and has not been authorized,
sponsored, or otherwise approved by Microsoft Corporation.
"Windows 7" and related materials are trademarks of Microsoft Corp.
© Designer Media Ltd
  

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30