Windows 7 Forums
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find support and solutions for any problems regarding your Windows 7 PC be it Dell, HP, Acer, Asus or a custom build. We also provide an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7: Change order in Navigation Pane

16 Sep 2013   #1
Revex

Windows 7 Professional x64
 
 
Change order in Navigation Pane

Hello everyone, nice to be here:)
I have simply question, but not sure about simply answer
I would like change order of items in Navigation Pane.
My Navigation Pane is like this

Favorites

Libraries

Homergroup

Computer

Network


and i want this order

Favorites

Computer

Network

Homergroup

Libraries


I found lot of topic how disable/enable one of them, but not order
Any chance to change this :-D


My System SpecsSystem Spec
.
21 Sep 2013   #2
A Guy

Microsoft Community Contributor Award Recipient

Windows 7 Home Premium x64 SP1
 
 

Welcome to Seven Forums Revex. You should be able to just drag and drop the favorites on the navigation pane.

Working with the navigation pane

Expand Customize your favorites

A Guy
My System SpecsSystem Spec
22 Sep 2013   #3
Revex

Windows 7 Professional x64
 
 

I dont want move only favorites, but all in navigation pane,

I have(Windows default)


I would like have

My System SpecsSystem Spec
.

03 Oct 2013   #4
Revex

Windows 7 Professional x64
 
 

Any tips ?
My System SpecsSystem Spec
03 Oct 2013   #5
A Guy

Microsoft Community Contributor Award Recipient

Windows 7 Home Premium x64 SP1
 
 

Let me see if anyone has any ideas. A Guy
My System SpecsSystem Spec
04 Oct 2013   #6
ICIT2LOL

Desk1 7 Home Prem / Desk2 10 Pro / Main lap Asus ROG 10 Pro 2 laptop Toshiba 7 Pro Asus P2520 7 & 10
 
 

Hmm well I can drag and drop the items if that is of any help I suppose you just delete the one that it started with and use the one above?

I'll try it on my tester if it goes ape then no probs.
My System SpecsSystem Spec
23 Oct 2013   #7
Revex

Windows 7 Professional x64
 
 

I try find something but no progress, something here ?
My System SpecsSystem Spec
02 Feb 2014   #8
Callender

Microsoft Windows 7 Home Premium 64-bit 7601 Multiprocessor Free Service Pack 1
 
 
Solution

Hi, I see this is an old thread but I had the same issues so here's the solution.

How to move Computer above Libraries in the Navigation pane in Windows 7 | Winaero


Attached Thumbnails
Change order in Navigation Pane-libraries.jpg  
My System SpecsSystem Spec
06 Apr 2014   #9
Revex

Windows 7 Professional x64
 
 

Thanks
My System SpecsSystem Spec
Reply

 Change order in Navigation Pane




Thread Tools




Similar help and support threads
Thread Forum
Navigation Pane - How do I change the emphasis from details to tree
In Windows XP, whenever I activate explorer.exe and specify my D drive (using this as my command: %SystemRoot%\explorer.exe /e,D:\) the result is that my D drive is at the top of the tree structure on the left, the Details pane is on the right, AND the D drive root in the Tree structure is...
General Discussion
How do I change the Control Panel Navigation Pane?
http://imageshack.com/a/img910/7154/pwagZH.jpg As you can see from the pic, I can barely see my Control Panel nav pane. I've searched and can't find how to change the background colour in Windows. My Explorer nav pane is just fine. What is the windows path or program to change this option? If...
Themes and Styles
Windows Explorer: Navigation Pane and Preview Pane Bug
When I open an instance of windows explorer, the navigation pane show little or nothing (no drives, folders, etc.). Also the preview pane does not show a preview for any selected files (See Capture1.JPG). If I open a second (or higher) instance of windows explorer, the navigation pane functions...
General Discussion
Navigation Pane
How can I get all drives to show under Computer in the navigation pane. The only one showing is drive (C:)OS? I put a check mark by show all empty drives, but that didn't work. I'm using the classic theme. Thanks Clint
General Discussion
Change Icon Size - Explorer Navigation Pane?
Is there a way to increase the size of the drive and/or folder icons in the navigation pane of Windows Explorer? It's easy to change the icon size in the folder pane or on the desktop, but these changes don't seem to affect the icons in the navigation pane of Explorer. I'm running Windows7 x64...
Customization


Our Sites

Site Links

About Us

Find Us

Windows 7 Forums is an independent web site and has not been authorized, sponsored, or otherwise approved by Microsoft Corporation. "Windows 7" and related materials are trademarks of Microsoft Corp.

© Designer Media Ltd

All times are GMT -5. The time now is 01:10.
Twitter Facebook