Windows 7 Forums
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find support and solutions for any problems regarding your Windows 7 PC be it Dell, HP, Acer, Asus or a custom build. We also provide an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7: Change Order of Grouped Buttons on Taskbar

11 Sep 2010   #11
brianzion

Operating System : Windows 7 Home Premium Edition 6.01.7600 SP1 (x64)
 
 

Quote   Quote: Originally Posted by Darician View Post
I certainly hope so. Users are sometimes so hard to please because they don't know how to explain themselves and somehow, it's your fault. Hopefully this turns out to be it. If not, post more details of what they want.
Their main page>>>>
MonkeyJob Systems


My System SpecsSystem Spec
.
11 Sep 2010   #12
MacGyvr

Windows 7 Ultimate RTM (Technet)
 
 

I think you meant "Their main page."
My System SpecsSystem Spec
12 Sep 2010   #13
brianzion

Operating System : Windows 7 Home Premium Edition 6.01.7600 SP1 (x64)
 
 

Quote   Quote: Originally Posted by MacGyvr View Post
I think you meant "Their main page."
thanks
My System SpecsSystem Spec
.

Reply

 Change Order of Grouped Buttons on Taskbar




Thread Tools




Similar help and support threads
Thread Forum
Canīt change order of taskbar properly
Hey everyone, I donīt know what happened but I canīt change the order of the pinned buttons in my taskbar. Partially actually. I had a preferred order (My documents/Chrome/Utorrent/iTunes) but now if I change one of the buttons they keep sticking. The weird part is that some buttons do...
General Discussion
change height of taskbar buttons
How can I change the height of these taskbar buttons to be shorter?
Customization
How to Rearrange Order of Grouped Windows in a button on taskbar
I hope I can articulate this properly... I just got a new Lenovo laptop from my company (Win 7 Pro 32 bit with MS Office 2010). The behaviour of the ordering of the similarly grouped items within a button is different. For example, I always have Outlook, Windows Explorer, IE and Excel open...
General Discussion
Change order that buttons appear in the Start Menu??
hi is there a way to change the order that it appears in the menu as you can see in the picture its "user, documents, pictures, music, videos, downloads" i want it to be in this order "downloads, documents, pictures, videos, music, user" and is there a way to get rid of the separator that are...
Customization
Taskbar buttons - auto order
I'm going nuts trying to find a solution for this. How can I have my taskbar buttons to open in the order they were opened and stay that way? (FYI buttons are un-grouped) It's mainly my internet buttons/tabs at the bottom. Before W7, they opened in the order I open them. Example: the last thing...
Customization


Our Sites

Site Links

About Us

Find Us

Windows 7 Forums is an independent web site and has not been authorized, sponsored, or otherwise approved by Microsoft Corporation. "Windows 7" and related materials are trademarks of Microsoft Corp.

Đ Designer Media Ltd

All times are GMT -5. The time now is 16:02.
Twitter Facebook Google+ Seven Forums iOS App Seven Forums Android App