Windows 7 Forums
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find support and solutions for any problems regarding your Windows 7 PC be it Dell, HP, Acer, Asus or a custom build. We also provide an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7: change order of taskbar thumbnail previews?

15 Jul 2009   #1
garbanzo

7600 x86
 
 
change order of taskbar thumbnail previews?

i always keep 2 firefox windows open when i'm working, one for work and one for, uh, non-work stuff. i always open my non-work window first, so its preview thumbnail is on the left, while the other window's preview thumb is on the right.

lately, they've been swapping for some reason. i'll go to open a particular window using the taskbar, and it will be on the wrong side.

is there any way to switch these short of shutting down the first window and opening it again?

i know it's pedantic, but i'm compulsive about this sort of thing, and it's really bugging me


My System SpecsSystem Spec
.
15 Jul 2009   #2
copernicus

7264x64/7260x86
 
 

Open them in order?

=D
My System SpecsSystem Spec
15 Jul 2009   #3
garbanzo

7600 x86
 
 

yeah, thanks for that. most helpful.
My System SpecsSystem Spec
.

15 Mar 2013   #4
jlindgren

Windows 7 64
 
 

I wish someone would have answered this seriously. I hate this too. I'm with ya garbanzo!
My System SpecsSystem Spec
Reply

 change order of taskbar thumbnail previews?




Thread Tools




Similar help and support threads
Thread Forum
Taskbar List or Thumbnail Previews Mode - Change
How to Change Taskbar Thumbnail and List Mode Threshold in Windows 7 and Windows 8 By default, the taskbar will show thumbnail previews of open windows and programs when you hover the mouse pointer over it's taskbar icon while using a Aero theme. When you are using a Basic or High...
Tutorials
Taskbar Thumbnail Previews - Change Margin Size
How to Change Margin Size of Taskbar Thumbnail Previews in Windows 7 and Windows 8 This will show you how to set the left, right, top, and bottom margin size to what you would like for the taskbar thumbnail previews in Windows 7 and Windows 8. You will not be able to have smaller margin...
Tutorials
Taskbar Thumbnail Previews - Change Space Size Between
How to Change Space Size Between Taskbar Thumbnail Previews in Windows 7 and Windows 8 This will show you how to change the space size between the taskbar thumbnail previews of a icon on the taskbar with multiple windows opened of it in Windows 7 and Windows 8. You will not be able to have a...
Tutorials
Taskbar Thumbnail Previews - Change Size
How to Change Size of Taskbar Thumbnail Previews in Windows 7 and Windows 8 This will show you how to set the maximum and/or minimum size in pixels that you want for your taskbar thumbnail previews in Windows 7 and Windows 8. You will not be able to have a smaller taskbar thumbnail preview...
Tutorials
Taskbar Thumbnail Previews - Change Delay Time
How to Change Taskbar Thumbnail Previews Delay Time to Display in Windows 7 and Windows 8 This tutorial will show you how to change the delay time for how long it takes to display taskbar thumbnail previews when you hover the mouse pointer over a taskbar button for only your user account in...
Tutorials


Our Sites

Site Links

About Us

Find Us

Windows 7 Forums is an independent web site and has not been authorized, sponsored, or otherwise approved by Microsoft Corporation. "Windows 7" and related materials are trademarks of Microsoft Corp.

Designer Media Ltd

All times are GMT -5. The time now is 10:13.
Twitter Facebook