Windows 7 Forums
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find support and solutions for any problems regarding your Windows 7 PC be it Dell, HP, Acer, Asus or a custom build. We also provide an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7: Canīt change order of taskbar properly

14 Dec 2014   #1
jseh

Windows 7 Ultimate 64-bit
 
 
Canīt change order of taskbar properly

Hey everyone,

I donīt know what happened but I canīt change the order of the pinned buttons in my taskbar.
Partially actually.
I had a preferred order (My documents/Chrome/Utorrent/iTunes) but now if I change one of the buttons they keep sticking.
The weird part is that some buttons do move, but it depends on where I leave it to drop or else they return to their original place(example: iTunes can only go left or mid left but not right or mid right) which doesn't make any sense.

I have not locked my taskbar.

What should I do to return it to the original state?
My System SpecsSystem Spec
.
16 Dec 2014   #2
oscer1

 

Hi welcome to seven forum

i would start by trying a restore point before the issue started.
My System SpecsSystem Spec
17 Dec 2014   #3
jseh

Windows 7 Ultimate 64-bit
 
 

Quote   Quote: Originally Posted by oscer1 View Post
Hi welcome to seven forum

i would start by trying a restore point before the issue started.
Hey Oscer1,
What exactly do you mean by that?
My System SpecsSystem Spec
.

17 Dec 2014   #4
Layback Bear

Windows 10 Pro. 64/ version 1709 Windows 7 Pro/64
 
 

This tutorial by Brink should help you.

System Restore
My System SpecsSystem Spec
17 Dec 2014   #5
MrRichGuy

Windows 7 Ultimate x64
 
 

Did your AVG 2015 warn you that he detected any virus recently? Try doing a full checkup on your computer.
My System SpecsSystem Spec
01 Apr 2016   #6
jseh

Windows 7 Ultimate 64-bit
 
 

Sorry for the very late reply.
I don't have the problem anymore.
Unfortunately, I don't know what the solution was anymore so I guess I can't mark it as solved(?).

I do know that I didn't do a system restore though.
My System SpecsSystem Spec
Reply

Thread Tools




Similar help and support threads
Thread Forum
Change taskbar column window order?
This question is about the taskbar (not folder view for clarification purposes). On my windows 7 the taskbar (set to combine when taskbar is full) in default lists the windows in descending order rather than ascending like XP did, which puts the most recent window at the bottom of the column...
General Discussion
change order of taskbar thumbnail previews?
i always keep 2 firefox windows open when i'm working, one for work and one for, uh, non-work stuff. i always open my non-work window first, so its preview thumbnail is on the left, while the other window's preview thumb is on the right. lately, they've been swapping for some reason. i'll go to...
General Discussion
Is it possible to dynamically change the order of icons in taskbar?
I'm hoping that is can be accomplished via the registry or something like that. Here's the reason for my question: I am using a laptop and it's LCD screen resolution is max 1900x1200. The icons in my Task bar are in a specific order/location. For example, on the LCD screen, I have two rows...
Customization
Cannot Change order of Pinned Taskbar icons
Hi Guys Im new and have never posted here before, so please help me out. I have my computer specs, I have windows ultimate 64-bit completely updated and Im having some trouble with pinning to the taskbar So I can pin items fine, but I can no longer change the order of the taskbar items. I...
Customization
Change Order of Grouped Buttons on Taskbar
When I open multiple instances of an application, say Internet Explorer, if I hover over the button group on the taskbar, the previews of the websites appear above the taskbar in the order in which they were opened from left to right (eg. 1st website on far left, ... last website on far right). I...
General Discussion


Our Sites

Site Links

About Us

Find Us

Windows 7 Forums is an independent web site and has not been authorized, sponsored, or otherwise approved by Microsoft Corporation. "Windows 7" and related materials are trademarks of Microsoft Corp.

ÂĐ Designer Media Ltd

All times are GMT -5. The time now is 22:28.
Twitter Facebook