Windows 7 Forums
Welcome to Windows 7 Forums. Our forum is dedicated to helping you find support and solutions for any problems regarding your Windows 7 PC be it Dell, HP, Acer, Asus or a custom build. We also provide an extensive Windows 7 tutorial section that covers a wide range of tips and tricks.


Windows 7: How to change the order of startup programs

26 Jun 2011   #11
gregrocker
Microsoft MVP

 

I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Win7 performance will show its appreciation.


My System SpecsSystem Spec
.
26 Jun 2011   #12
richc46

Microsoft Community Contributor Award Recipient

Windows 10, Home Clean Install
 
 

Quote   Quote: Originally Posted by gregrocker View Post
For absolute best performance uncheck all Startup items except AV and gadgets in msconfig>Startup. Only let in those you can't do without starting up with Win7. Startup Programs - Change

For even better performance replace the MucAfee bloatware with lean lightweight MSE or Avast 6.
Agreed. When I went from Mcafee to MSE, MSE even found a Trojan missed by Mcafee.
If you do switch, be sure to use the uninstall tool provided by Mcafee.
My System SpecsSystem Spec
26 Jun 2011   #13
karlsnooks

MS Windows 7 Ultimate SP1 64-bit
 
 

Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Win7 performance will show its appreciation.
+1
Sometimes you will find that you also need to also let the synaptics touchpad driver install.

Greg has given you some excellent advice. If you would like you can use the following procedure and we can look at precisely what msconfig shows as starting.

LIST OF STARTUP PROGRAMS USING CCLEANER


CCleaner | Tasks icon | Startup tab | click on Save to text file button (bottom right side)

Using the PAPER CLIP icon in the top panel of a Message Reply window, attach the .txt file generated by CCleaner.
My System SpecsSystem Spec
.

26 Jun 2011   #14
Oaken

Windows 7
 
 

Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Win7 performance will show its appreciation.
Each to their own of course Greg. I've used WP for years and suffered only one minor glitch with a particular update. Otherwise it's always saved me far more boot time than it costs. When I installed Soluto (for a looksee) it calculated that WP added under two seconds. It suits me because it delivers the volume of starts I require in 44 seconds, whereas Windows/msconfig is over a minute.
My System SpecsSystem Spec
26 Jun 2011   #15
MacGyvr

Windows 7 Ultimate RTM (Technet)
 
 

Remove McAfee and install MSE....problem solved.
My System SpecsSystem Spec
27 Jun 2011   #16
whs
Microsoft MVP

Vista, Windows7, Mint Mate, Zorin, Windows 8
 
 

Quote   Quote: Originally Posted by Oaken View Post
Quote   Quote: Originally Posted by gregrocker View Post
I stopped using startup managers like WinPatrol because they add to Startup time and can have issues.

Best to just turn off everything except AV and gadgets unless there's one or two others you can't wait to startup when needed. Win7 performance will show its appreciation.
Each to their own of course Greg. I've used WP for years and suffered only one minor glitch with a particular update. Otherwise it's always saved me far more boot time than it costs. When I installed Soluto (for a looksee) it calculated that WP added under two seconds. It suits me because it delivers the volume of starts I require in 44 seconds, whereas Windows/msconfig is over a minute.
I have to agree. I use it all the time (the pro version) and never had a problem. I like it especially for easy of delaying startups. Besides it is a good watchdog.
My System SpecsSystem Spec
27 Jun 2011   #17
karlsnooks

MS Windows 7 Ultimate SP1 64-bit
 
 

For the every day user, MSCONFIG is plenty. For the advanced user, there is autoruns, procexp, and procmon.
My System SpecsSystem Spec
27 Jun 2011   #18
gregrocker
Microsoft MVP

 

If you have no startups besides AV and gadgets, which gives best performance, why would you need WinPatrol or Soluto? To delay System services?

Just askin.
My System SpecsSystem Spec
06 Mar 2014   #19
Callender

Microsoft Windows 7 Home Premium 64-bit 7601 Multiprocessor Free Service Pack 1
 
 
Suggested reading material

I know this is an old thread but I was looking for a solution to the same problem. If anyone is interested there's a few decent enough solutions here:

Speed up your Windows startup with these tricks | Winaero
My System SpecsSystem Spec
19 Oct 2018   #20
miztrniceguy

Win 7 Pro 64 bit
 
 

I know this is an old thread, but my question is related. I want to have my wireless start sooner (but after Malwarebytes and MSE), as it seems to be the last thing.
I installed WinPatrol (free) and see the list. I can see how to move to delayed start, but not how to move an item up in the list to be sooner.
My System SpecsSystem Spec
Reply

 How to change the order of startup programs




Thread Tools




Similar help and support threads
Thread Forum
Startup Programs - Change
How to Change, Add, or Remove Startup Programs in Windows 7 This will show you how to either add, remove, enable, or disable a startup program in Windows 7.You can also view the startup logs in Event Viewer (C:\Windows\system32\eventvwr.msc) under Applications and Services Logs, Microsoft,...
Tutorials
How can I change sort order for "Search Programs and files" results?
Hi How do I get the search box "search programs and files" (i.e. the one above the Start button) to sort the results within each section by DATE, rather than by name? Note I do NOT mean the search top right in Windows Explorer, which fwiw, is already working nicely in date order! Clue: I...
General Discussion
Is it possible to control the order of the programs at startup ??
hey guys, is it possible to control the order of the programs at startup ?? i mean like i want a program to start before others and so... the problem is that i installed many programs including sql adobe vmware..... i noticed wlm starts to slow now, my boot is slower and when i click on...
Performance & Maintenance
Order of programs in boot
I would like to have my MSE boot before anything else does. Is there any way to change the order in which programs boot?? Thanks.
Performance & Maintenance
Why is there no Control Panel/Programs/Change Startup..
..Programs anymore? I liked how Vista had that feature. Now it seems the only way to disable startup programs is by 'msconfig' right?
Software


Our Sites

Site Links

About Us

Find Us

Windows 7 Forums is an independent web site and has not been authorized, sponsored, or otherwise approved by Microsoft Corporation. "Windows 7" and related materials are trademarks of Microsoft Corp.

Designer Media Ltd

All times are GMT -5. The time now is 06:54.
Twitter Facebook Google+