What a long weekend - 'Recabling Project' dubbed "The Big Weekend"
Imagine, if you will, 8 – 10 years of poor cable management, poor cabinet layout, and cables 10x too long for the job at hand. Whatever you now have in your head, double it, and you might be getting close to our upstairs comms room.
This mass of cables to the right is comprised of around 2000 floor ports and 19 1u 18 port switches, and a whole heap of cable! I would say at least 50% of the cable is not actually in use, but has become so tangled and matted, it’s easier for the guys to run a new cable than move the old one – which obviously only serves to compound the problem!!
This single room has around 60% off our office space and 30% of our warehouse space patched into it. So downtime windows long enough to tackle this mess are few and far between.
But, thanks to Kate and Wills, we have been graced with an extra 4 day weekend this year. So we are going to take the opportunity to recable the entire room. Several codenodes for the projects have been suggested, including “project subo”, but we eventually settled on “The Big Weekend”
Check out the time lapse video
- YouTube - Network Room Recabling Time Lapse
Before



Check out the time lapse video
- YouTube - Network Room Recabling Time Lapse
Regards,
JDobbsy1987
Just thought i would share this with you all 
Check out the time lapse video here or see below
- YouTube - Network Room Recabling Time Lapse
Check out the time lapse video here or see below
Imagine, if you will, 8 – 10 years of poor cable management, poor cabinet layout, and cables 10x too long for the job at hand. Whatever you now have in your head, double it, and you might be getting close to our upstairs comms room.
This mass of cables to the right is comprised of around 2000 floor ports and 19 1u 18 port switches, and a whole heap of cable! I would say at least 50% of the cable is not actually in use, but has become so tangled and matted, it’s easier for the guys to run a new cable than move the old one – which obviously only serves to compound the problem!!
This single room has around 60% off our office space and 30% of our warehouse space patched into it. So downtime windows long enough to tackle this mess are few and far between.
But, thanks to Kate and Wills, we have been graced with an extra 4 day weekend this year. So we are going to take the opportunity to recable the entire room. Several codenodes for the projects have been suggested, including “project subo”, but we eventually settled on “The Big Weekend”
Check out the time lapse video
Before


Check out the time lapse video
- YouTube - Network Room Recabling Time Lapse
After
Check out the time lapse video
Regards,
JDobbsy1987
My Computer
At a glance
Windows 8.1 Pro x64Intel Core i5-2500K @ 3.30GHz - S11558GB Corsair DDR3 XMS3, PC3-12800NVIDIA GeForce GTX 650
- Computer type
- PC/Desktop
- Computer Manufacturer/Model Number
- Self Built
- OS
- Windows 8.1 Pro x64
- CPU
- Intel Core i5-2500K @ 3.30GHz - S1155
- Motherboard
- Asus P8P67 LE Rev3, Intel P67, S115
- Memory
- 8GB Corsair DDR3 XMS3, PC3-12800
- Graphics Card(s)
- NVIDIA GeForce GTX 650
- Sound Card
- On-Board
- Monitor(s) Displays
- 3 x 24" {Extended Display}
- Screen Resolution
- 1920 x 1080
- Hard Drives
- 300GB Seagate Barracuda 7200
- PSU
- 550W Coolermaster GX550
- Case
- Silverstone Precision PS04B
- Cooling
- Stock
- Keyboard
- Logitech K120
- Mouse
- World of Warcraft Cataclysm MMO Gaming Mouse
- Internet Speed
- 80 MB
- Antivirus
- MSE / Windows Defender
- Browser
- Chrome