alexdagr8est
New member
- Local time
- 12:58 AM
- Messages
- 18
Hi Guys Im new and have never posted here before, so please help me out.
I have my computer specs, I have windows ultimate 64-bit completely updated and Im having some trouble with pinning to the taskbar
So I can pin items fine, but I can no longer change the order of the taskbar items.
I previously had (from left to right) Chrome> WMP > Explorer > Steam (Gaming Platform)
Only those four in that order, I tried pinning something else, which didnt work, and now I have this dilemma - it changed the order of the pinned icons and now I cannot seem to change them back into the desired order. Im guessing some regedit might fix this.
Tried locking and unlocking the taskbar
also tried going to
C:\Users\"user"\AppData\Roaming\Microsoft\Internet Explorer\Quick Launch\User Pinned\TaskBar
and checked to see if there was any pinned programs that shouldnt be there. Any other Ideas?
I have my computer specs, I have windows ultimate 64-bit completely updated and Im having some trouble with pinning to the taskbar
So I can pin items fine, but I can no longer change the order of the taskbar items.
I previously had (from left to right) Chrome> WMP > Explorer > Steam (Gaming Platform)
Only those four in that order, I tried pinning something else, which didnt work, and now I have this dilemma - it changed the order of the pinned icons and now I cannot seem to change them back into the desired order. Im guessing some regedit might fix this.
Tried locking and unlocking the taskbar
also tried going to
C:\Users\"user"\AppData\Roaming\Microsoft\Internet Explorer\Quick Launch\User Pinned\TaskBar
and checked to see if there was any pinned programs that shouldnt be there. Any other Ideas?
My Computer
At a glance
Windows 7 Ultimate x64Core 2 quad Q9550 2.93Ghz OC'd to 4.28GB Gskill DDR3 1600Mhz2x Gtx 280 (SLI) Asus
- Computer Manufacturer/Model Number
- Self Made
- OS
- Windows 7 Ultimate x64
- CPU
- Core 2 quad Q9550 2.93Ghz OC'd to 4.2
- Motherboard
- XFX 790i Ultra (tri SLI)
- Memory
- 8GB Gskill DDR3 1600Mhz
- Graphics Card(s)
- 2x Gtx 280 (SLI) Asus
- Sound Card
- Creative Xi-Fi Titanium Fatality 1 Ty
- Monitor(s) Displays
- Alienware 120Hz 23'' 1920x1080, 2x Benq G2420 1920x1080 24"
- Screen Resolution
- 1920x1080 *3
- Hard Drives
- 2x Samsung Spinpoint F1's 750GB HDD
1x Samsung Spinpoint 2TB
- PSU
- Antec 850 watt
- Case
- Cooler Master Centurion
- Cooling
- 8x 8'' Fans, Coolermaster CPU Cooler.
- Keyboard
- Logitech G19, Logitech Dinovo Edge, Logitech Dinovo Mini
- Mouse
- Logitech G9x and Logitech G7
- Internet Speed
- 13Mb Down, 1.3 Mb Up
- Other Info
- Logitech Z5500 5.1 Surround Speakers,
Nvidia 3D Vision