i always keep 2 firefox windows open when i'm working, one for work and one for, uh, non-work stuff. i always open my non-work window first, so its preview thumbnail is on the left, while the other window's preview thumb is on the right.
lately, they've been swapping for some reason. i'll go to open a particular window using the taskbar, and it will be on the wrong side.
is there any way to switch these short of shutting down the first window and opening it again?
i know it's pedantic, but i'm compulsive about this sort of thing, and it's really bugging me :mad2:
lately, they've been swapping for some reason. i'll go to open a particular window using the taskbar, and it will be on the wrong side.
is there any way to switch these short of shutting down the first window and opening it again?
i know it's pedantic, but i'm compulsive about this sort of thing, and it's really bugging me :mad2:
My Computer
- OS
- 7600 x86
- CPU
- Core 2 Duo e7200, 2.53 ghz
- Motherboard
- Micro-Star MS-7529
- Memory
- 2x DDR2 PC5300 1gb, 667 mhz
- Graphics Card(s)
- GeForce 9500gt, 512mb
- Monitor(s) Displays
- 22" LG Flatron w2234s
- Screen Resolution
- 1680x1050
- Hard Drives
- Excelstor SATA-II 250gb 7200rpm, 8mb cache
- PSU
- CoolerMaster M520
- Internet Speed
- 30/20 mbits