change order in right click drop down box...?

msongs

New member
Member
VIP
Local time
3:39 PM
Messages
184
Location
riverside california USA
in graphic programs, explorer, etc when I right click I get a drop down box showing

"rename"

well right above that is "delete" and I'm frequently getting the two mixed when clicking, tho I don't usually actually delete cause I catch that first.

Is there a way to seperate those and reorder the drop down list so they are farther apart. It gets to be a nuisance sometimes when I am rename picture files.
 

My Computer My Computer

At a glance

windows 7 64bitintel i7 9206gb ddr3ge force 9400
Computer Manufacturer/Model Number
build it myself
OS
windows 7 64bit
CPU
intel i7 920
Motherboard
gigabyte ex58 ds4
Memory
6gb ddr3
Graphics Card(s)
ge force 9400
Sound Card
onboard hd
Monitor(s) Displays
samsung 215tw
Screen Resolution
1680 x 1050
Hard Drives
wd caviar black 1 TB/620GB wd caviar blue
PSU
enermax 625 w modu82
Case
antec 182
Cooling
cooler master v8, 3 case fans
Keyboard
cheapo ps/2
Mouse
cheapo usb
Internet Speed
5 MB
Not an answer to your question but a still a solution of sorts.

Press F2 to bring up the rename dialog. No confusion that way :D
 

My Computer My Computer

At a glance

Windows 10 Pro X64Intel Quad Core i7-4770 @ 3.4Ghz16.0GB PC3-12800 DDR3 SDRAM 1600 MHzIntel Integrated HD Graphics
Computer type
PC/Desktop
Computer Manufacturer/Model Number
Lenovo IdeaCenter 450
OS
Windows 10 Pro X64
CPU
Intel Quad Core i7-4770 @ 3.4Ghz
Memory
16.0GB PC3-12800 DDR3 SDRAM 1600 MHz
Graphics Card(s)
Intel Integrated HD Graphics
Sound Card
Realtek HD Audio
Monitor(s) Displays
HP 22" LCD
Screen Resolution
1680 x 1050
Hard Drives
250GB Samsung EVO SATA-3 SSD
2TB Seagate ST2000DM001 SATA-2
1.5TB Seagate ST3150041AS SATA
Keyboard
Dell USB
Mouse
Lenovo USB
Internet Speed
Cable via Road Runner 3MB Upload, 30MB Download
Antivirus
Windows Defender, MBAM Pro, MBAE
Browser
Seamonkey
Other Info
UEFI/GPT
PLDS DVD-RW DH16AERSH
Not an answer to your question but a still a solution of sorts.

Press F2 to bring up the rename dialog. No confusion that way :D

Heh... I did not know this trick despite making heavy use of keyboard shortcuts. Thanks!
 

My Computer My Computer

At a glance

Win7 Pro x64Koa i5-2550K8 GBSapphire ATI 6870 1GB GDDR5
Computer Manufacturer/Model Number
Self-built rig
OS
Win7 Pro x64
CPU
Koa i5-2550K
Memory
8 GB
Graphics Card(s)
Sapphire ATI 6870 1GB GDDR5
Sound Card
RealTek HD Audio / ATI HDMI Audio
Monitor(s) Displays
Samsung HDTV Monitor T23A350
Screen Resolution
1920 x 1080
Hard Drives
- SSD (C:)
- HDD (D:)
- BD-ROM (E:)
Keyboard
Logitech G110
Internet Speed
Unifi home (5mbps)
Me neither! :D

Thanks Ztruker.
 

My Computer My Computer

At a glance

Win 7 Ultimate, Win 8.1 Pro, Linux Mint 19 Ci...Intel i5 4690KCorsair Vengeance LP 32GB DDR3MSI GTX 1060 GAMING X 6GB
Computer type
PC/Desktop
Computer Manufacturer/Model Number
Custom Build
OS
Win 7 Ultimate, Win 8.1 Pro, Linux Mint 19 Cinnamon (All 64-Bit)
CPU
Intel i5 4690K
Motherboard
Gigabyte Z97X-UD3H
Memory
Corsair Vengeance LP 32GB DDR3
Graphics Card(s)
MSI GTX 1060 GAMING X 6GB
Sound Card
Onboard
Hard Drives
Samsung 850 EVO 250GB SSD (x2)
Samsung 860 EVO 1TB SSD (x2)
Crucial MX300 525GB SSD
WD Blue 2TB 5400rpm Intellipark Disabled (x2)
PSU
Corsair HX750i
Case
Phanteks Enthoo Pro
Cooling
CM Hyper 212 EVO on CPU, Noctua Redux NF-P14S 1500rpm (x6)
Keyboard
Corsair K70 RGB LUX
Mouse
Corsair Sabre RGB
Antivirus
Avast Free, MalwareBytes, SAS & CryptoPrevent
Browser
Chrome
Other Info
StarTech PEXESAT322I 2 Port PCI-E SATA Card
ASUS PCE-AC56 Dual-band AC1300 Wireless Card
Akasa FC.Six Manual Fan Controller
And a Partridge in a Pear Tree!
Back
Top