in graphic programs, explorer, etc when I right click I get a drop down box showing
"rename"
well right above that is "delete" and I'm frequently getting the two mixed when clicking, tho I don't usually actually delete cause I catch that first.
Is there a way to seperate those and reorder the drop down list so they are farther apart. It gets to be a nuisance sometimes when I am rename picture files.
"rename"
well right above that is "delete" and I'm frequently getting the two mixed when clicking, tho I don't usually actually delete cause I catch that first.
Is there a way to seperate those and reorder the drop down list so they are farther apart. It gets to be a nuisance sometimes when I am rename picture files.
My Computer
- Computer Manufacturer/Model Number
- build it myself
- OS
- windows 7 64bit
- CPU
- intel i7 920
- Motherboard
- gigabyte ex58 ds4
- Memory
- 6gb ddr3
- Graphics Card(s)
- ge force 9400
- Sound Card
- onboard hd
- Monitor(s) Displays
- samsung 215tw
- Screen Resolution
- 1680 x 1050
- Hard Drives
- wd caviar black 1 TB/620GB wd caviar blue
- PSU
- enermax 625 w modu82
- Case
- antec 182
- Cooling
- cooler master v8, 3 case fans
- Keyboard
- cheapo ps/2
- Mouse
- cheapo usb
- Internet Speed
- 5 MB