Requesting Help With Windows 7 Partitions

Windows7Nubie

New member
Local time
2:23 AM
Messages
18
Hello Everyone,

Is it now REQUIRED that the boot partition for Windows 7 be separate from the partition with the OS files? Is there now a REQUIRED ORDER to the partitions on a Windows 7 disk.

Here is why I am asking:
Years ago I setup my system.

I have 7 hard disk drives in my system box.
Each drive has a power switch that can be actuated when the system is powered down to determine which drive I will be using/booting.
Each drive has a different setup, and is bootable.
3 of my drives are Windows 7 Pro 64 bit.
The other 4 are Windows XP Pro 32 bit.

Recently I decided to use an image of a Windows 7 drive to change one of the Windows XP drives to become a Windows 7 drive.

I deleted the Windows XP partitions to make the drive appear as completely unallocated space.
Then I tried to restore a Windows 7 image to that drive.
The program I am using is the latest version of Acronis Backup PC run from a Windows PE 3.0 CD.

The problem I think I am having is two pronged.
One is that the controller of the formerly XP disk is a Marvell and the controller of the disk that provides the Windows 7 image is an Intel. This should be handled by Universal Restore which is a part of the Acronis program.

Two, when I setup my 3 Windows 7 disks, I did NOT create a separate boot partition. I have one active partition that has both the boot files and OS files, and I have a second (D) non-bootable primary partition that just has data.

This appears to confound the Acronis program which forces the data partition (D) to appear first on the restored hard disk and the OS/boot (C) partition appears as a second partition on the restored disk.

I cannot get the restored drive to boot even though all the files are there.

I know with earlier versions of the Acronis program I have done restores of my Windows 7 disks on the intel controller successfully. And I have been doing backups regularly assuming that they would always restore.

Now I am worried that my backups created with the later versions of the Acronis program will not be restoreable because Acronis is assuming the presence of the 100MB boot partition and when I have none, it cannot cope.

Before I go opening a ticket with them that I will have to pay for, I would like to know is it required now with whatever Service Pack MS is up to that there be a separate boot partition and is there a required order to how the partitions appear on the hard disk?

Thanks for whatever guidance you can offer.
 

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
Can you post a screenshot of the partitions so we can see? Is this MBR. Disk with MBR you can't boot to a partition past 2gig as there isn't enough code space
 

My Computer My Computer

At a glance

win 8 32 bit
Computer type
PC/Desktop
OS
win 8 32 bit
Thank you for the reply, samuria.

I do have the motherboard set to use BIOS not efi.
There is a MBR which I restored from the Windows 7 image backup.
The Windows 7 partitions are NTFS.
The size of the hard disk is 1 TB.

I can only do a screenshot by photographing with a camera and then uploading the jpeg.
Would this be helpful?
 

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
That would help
 

My Computer My Computer

At a glance

win 8 32 bit
Computer type
PC/Desktop
OS
win 8 32 bit
Okay, attached are two photos from Paragon Disk Manager Pro 15 Win PE 3.0 Recovery Disk
 

Attachments

  • list.jpg
    list.jpg
    245.3 KB · Views: 1
  • map.jpg
    map.jpg
    233.7 KB · Views: 1

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
I should also mention that I tried to recover again and this time I selected "create new nt signature" and as a consequence Acronis appears to have restored the partitions in the correct order, but even with Universal Restore the drive still does not boot.
 

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
Here is a photo of the bsod when it tries to boot.

It does not like some aspect of the Marvell Driver, but I cannot understand whether it is missing, wrong, too old, too new, or what?
 

Attachments

  • bsod-marvell_driver.jpg
    bsod-marvell_driver.jpg
    596 KB · Views: 1

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
I did some more research and experiments.
Now I am more confused.

I am able to install Windows 7 on the drive attached to the Marvell controller from scratch without loading any Marvell driver during the install process. This installation has the 100 MB System Reserved partition as the boot partition.

I checked my other Windows 7 drives on the Intel controller and they have the Marvell driver 1041, and show the presence of the controller in Device Manager as a Marvell controller.

If I try to install that same Marvell driver (1041) onto the drive directly attached to the Marvell controller (the one with the System Reserved boot partition) the drive crashes upon attempting to boot.

I looked at the other drive with Windows XP on the Marvell controller and I see that the Marvell driver 1008 is present in the drives file hierarchy; however, when I look at the Windows XP Device Manager, I only see generic references to the controller and it appears that the Marvell driver is not loaded for those generic references.

I am starting to wonder if the motherboard needs a bios update. I would not even try this as I have no way of knowing if it will solve this problem or create new ones.

So if no one has any ideas for me I will probably just setup Windows 7 from scratch without the Marvell driver.

But I would still like to know whether that system reserved boot partition is necessary and is there any required order to how the partitions appear on the disk.

TIA
 

My Computer My Computer

At a glance

Windows 7 Pro 32bit and Windows 7 Pro 64bit
Computer type
PC/Desktop
OS
Windows 7 Pro 32bit and Windows 7 Pro 64bit
Back
Top